I have the 44" version. So far I've not seen any between jobs cuts, only when the roll is loaded. IMO the leading edge should not be cut for each and every load reload. It should be optional. Also a user settable first load cut off would have been welcome. The tape on the rolls needs to go past the marks left which require at least three trim button tasks. Please note to any new users, before calibrating, always cut off at least three trim operations as the tape marks will greatly distort calibrations.